I helped lay out, cut, and install the new upper “Cable Tray”:
Helped cut, thread & install new conduits onto the “Cable Tray”:
I measured and bent these eight offsets for a new Heavy-Wall Conduit run, with pipes ranging in side from 3/4" to 2-1/2":
At home, I built ramps so that they could drive their company Work Trailers onto their Conex, at the end of each day: